MCC Selection for Additional Alert Messages After Position Confirmation, and LGM MCC Commissioning Status

DDR  Destination MCC Maximum Number of Alerts Requested after Position Confirmation (1) LGM Operational (2) LGM entry in Operation Date FGB ELT(DT) (3) SGB (4)
Central DDR CYMCC 999 YES Nov-19    
FMCC 0 YES Dec-16  JC-36   EWG-3C/2022
GRMCC 999 YES Jun-21     
ITMCC 999 YES Mar-22     
NMCC 0 YES Sep-17     
TRMCC 0 YES Dec-20    
UKMCC 999 YES Jun-19    
Eastern DDR CMC 0 YES  Sep-22    
INMCC 999 NO      
PAMCC 999 NO      
North West Pacific DDR CNMCC 0 NO      
HKMCC 1 NO      
JAMCC 999 YES Apr-20     
KOMCC 0 NO      
TAMCC 0 YES Mar-22    
VNMCC 1 NO      
South Central DDR AEMCC 999 NO      
ALMCC 999 YES May-20    
NIMCC 999 NO      
QAMCC 999 YES Oct-19    
SAMCC 999 NO      
SPMCC 999 YES Jan-19     
South West Pacific DDR ASMCC 999 NO      
AUMCC 999 YES Jul-19    
IDMCC 999 NO      
SIMCC 999 YES Apr-20    
THMCC 999 NO      
Western DDR ARMCC 999 NO      
BRMCC 999 NO      
CHMCC 999 YES Nov-20     
CMCC 0 NO      
PEMCC 999 NO      
USMCC 999 YES Dec-16   JC-36  JC-36

 as at 14-Mar-2023

Legend

0 MCC has requested that no additional alert messages for a particular beacon activation be sent to it after a message has been received that includes a confirmed position for that beacon.
999 MCC has requested to receive unlimited additional alert messages for a particular beacon activation even after receiving a confirmed beacon position.
[xx] The number specifies the maximum number of additional alert messages desired by the MCC after receiving a confirmed position from a particular beacon activation. 

 

 

 

 

 

 

 

 

Notes:

(1) Maximum Number of Alerts Requested after Position Confirmation:

  • All MCCs by default will receive continued transmission of MEOSAR data for a beacon, even after initial position confirmation (and will be shown as 999 above) unless the MCC has notified its nodal MCC and the Secretariat of a preferred numerical limit to messages after initial confirmation of a beacon’s position.
  • Per document C/S A.001 section 3.2.5, the capability to limit the number of alerts after position confirmation is not required.

(2) For current operational status of MCCs, see the Cospas-Sarsat Quality Monitoring System (QMS) tables.

The following status information is provided from the EWG/JC formal recommendation when:
(3) the MCC is commissioned for FGB ELT(DT) capability.
(4) the MCC is commissioned for SGB capability (including SGB ELT(DT)).